Heavy repair bay extension, 65 t crane bay, Hubballi

Shop drawings and crane runway girders for an 85 m crane bay extension to the diesel loco shed at Hubballi, for South Western Railway. In progress.

Drawing of a typical steel shed. Shown until a photograph of this project is added.

An extension to the heavy repair bay of the diesel loco shed at Hubballi, served by a 65 t crane. The building is 85 m long in 12 bays, with eaves at +13.5 m.

The roof is carried on 13 trusses spanning 18.15 m and 26 laced double-column towers. The crane runs on 24 built-up plate girders carrying 52 kg rail.

Engineering

Shop drawings for the roof trusses, laced column towers and crane girders.

Fabrication

24 welded crane runway girders for the 65 t crane.

More railway projects

Send us your drawings.

We will come back with a quotation. Share drawings, a BOQ or a short description of the structure; the engineering team reviews every enquiry before quoting.

  1. 01Technical review — An engineer reviews your drawings and requirements.
  2. 02Clarifications — If anything is unclear or missing, we ask before pricing.
  3. 03Quotation — You receive a quotation with scope, programme and exclusions.
Drawing transmittal
To
Engineering team
Purpose
For quotation

What to include

  • Drawings · PDF, DWG, DXF, IFC
  • Approximate tonnage
  • Site location
  • Required-by date
  • Specification · grade, paint, inspection

or email nrkinfra@icloud.com