Six foot over bridges, Hubballi–Chikjajur line

Structural steel for six foot over bridges on the Hubballi–Chikjajur doubling, fabricated and erected for South Western Railway.

Drawing of a typical railway foot over bridge. Shown until a photograph of this project is added.

Six new foot over bridges at Sasalu, Mayakonda, Kodaganur, Tholahunse, Chalegere and Devaragudda stations, built as part of doubling the Hubballi–Chikjajur line.

NRK Infra Projects fabricated 571.5 t of structural steel for the bridges, 146.4 t of it for the superstructure, and erected them. South Western Railway certified the work as completed in October 2023, with performance rated satisfactory.

Fabrication

571.5 t of structural steel fabricated for the six bridges, including 146.4 t of superstructure steel.

Erection

The bridges were erected by the company at all six stations.

More railway projects

Send us your drawings.

We will come back with a quotation. Share drawings, a BOQ or a short description of the structure; the engineering team reviews every enquiry before quoting.

  1. 01Technical review — An engineer reviews your drawings and requirements.
  2. 02Clarifications — If anything is unclear or missing, we ask before pricing.
  3. 03Quotation — You receive a quotation with scope, programme and exclusions.
Drawing transmittal
To
Engineering team
Purpose
For quotation

What to include

  • Drawings · PDF, DWG, DXF, IFC
  • Approximate tonnage
  • Site location
  • Required-by date
  • Specification · grade, paint, inspection

or email nrkinfra@icloud.com