Manufacturing facility
The plant, how steel moves through it, and the records that go with every job.
- Covered shop
- 34,860 sq ft
- Site
- 2 acres
- Fabricated a month
- 150–200 t
Plant · Kudumalakunte, Gauribidanur, Karnataka
Manufacturing facility

01The plant
Our own plant at Plot No. 80, Kudumalakunte, Gauribidanur Taluk, Chikkaballapur District, Karnataka 561208, north of Bengaluru. It has 34,860 sq ft of covered shop on a 2-acre site and fabricates 150 to 200 t of structural steel a month.
02Production process
Every job is checked at every step, and every check is recorded.
01Drawings and material
Drawing revision and material list approved before cutting; grade and heat number of every plate and section matched to its mill certificate.
Drawing approval · Material traceability
02Cut and drill
Cut and drilled to the approved shop drawings; the first piece is checked against the drawing.
First-piece check
03Fit-up and weld
Members fitted up and welded; every weld checked visually, with DPT or UT where specified.
Weld inspection
04Inspection
Dimensions and welds checked before finishing, and recorded in the job's reports.
Dimensional check
05Blast and paint
Blast cleaned and painted to the project specification; surface profile and paint thickness recorded.
Coating inspection
06Dispatch
Dispatch list matched to the erection marks, then loaded for site.
Dispatch check
03Records you receive
Handed over with every job.
Mill certificates
Grade and properties of the steel supplied
Dimensional reports
Measured dimensions against the drawing
Weld reports
Visual weld checks
NDT reports
DPT or UT results, where specified
Paint thickness records
Surface profile and dry film thickness
Dispatch list
Members and erection marks in each consignment
Client and third-party inspection is welcome.
04Location
Plant
Plot No. 80, KudumalakunteGauribidanur TalukChikkaballapur DistrictKarnataka 561208Open in MapsGetting here
- Kudumalakunte industrial area, about 13 km from Gauribidanur town
- From the Yelahanka office: about 80 km by road through Doddaballapura and Gauribidanur, roughly two hours
- From Kempegowda International Airport: about 85 km
- Nearest main railway station: Gauribidanur, on the line from Yelahanka
See the plant for yourself
Arrange a visit to see the shop, the equipment and the quality system at work.
- To
- Engineering team
- Purpose
- Factory visit