Platform shelters and foot over bridges, Londa–Miraj line
Steelwork for platform shelters and foot over bridges at six stations on the Londa–Miraj doubling, for South Western Railway.
Station buildings, platforms, platform shelters and foot over bridges at six stations, built as part of doubling the Londa–Miraj line. South Western Railway recorded the work as completed in December 2023.
Fabrication
Structural steel for the platform shelters and foot over bridges.
More railway projects
Railway
Six foot over bridges, Hubballi–Chikjajur line
- Type
- Location
- Completed
- Steel
- Foot over bridges
- Hubballi–Chikjajur section, Karnataka, India
- 2023
- 571.5 t
- Fabrication
- Erection
Railway
Electric loco sheds, Guntakal
- Type
- Location
- Completed
- Loco shed
- Guntakal, Andhra Pradesh, India
- 2022
- Fabrication
- Erection
Railway
Diesel loco shed extension, Hubballi
- Type
- Location
- Completed
- Loco shed extension
- Hubballi, Karnataka, India
- 2017
- Fabrication
- Erection
Send us your drawings.
We will come back with a quotation. Share drawings, a BOQ or a short description of the structure; the engineering team reviews every enquiry before quoting.
- 01Technical review — An engineer reviews your drawings and requirements.
- 02Clarifications — If anything is unclear or missing, we ask before pricing.
- 03Quotation — You receive a quotation with scope, programme and exclusions.
Drawing transmittal
- To
- Engineering team
- Purpose
- For quotation
What to include
- Drawings · PDF, DWG, DXF, IFC
- Approximate tonnage
- Site location
- Required-by date
- Specification · grade, paint, inspection
or email nrkinfra@icloud.com