Skip to content

Platform shelters and foot over bridges, Londa–Miraj line

Steelwork for platform shelters and foot over bridges at six stations on the Londa–Miraj doubling, for South Western Railway.

Drawing of a typical railway foot over bridge. Shown until a photograph of this project is added.

Station buildings, platforms, platform shelters and foot over bridges at six stations, built as part of doubling the Londa–Miraj line. South Western Railway recorded the work as completed in December 2023.

Fabrication

Structural steel for the platform shelters and foot over bridges.

More railway projects

Send us your drawings.

We will come back with a quotation. Share drawings, a BOQ or a short description of the structure; the engineering team reviews every enquiry before quoting.

  1. 01Technical review — An engineer reviews your drawings and requirements.
  2. 02Clarifications — If anything is unclear or missing, we ask before pricing.
  3. 03Quotation — You receive a quotation with scope, programme and exclusions.
Drawing transmittal
To
Engineering team
Purpose
For quotation

What to include

  • Drawings · PDF, DWG, DXF, IFC
  • Approximate tonnage
  • Site location
  • Required-by date
  • Specification · grade, paint, inspection

or email nrkinfra@icloud.com